首页 | 本学科首页   官方微博 | 高级检索  
检索        

某95×10~4t/a焦化项目职业病危害预评价
引用本文:许晓丽,江世强,吕林,段平宁,杨静,聂传丽,黄世文,黄才千.某95×10~4t/a焦化项目职业病危害预评价[J].职业与健康,2010,26(13):1523-1525.
作者姓名:许晓丽  江世强  吕林  段平宁  杨静  聂传丽  黄世文  黄才千
作者单位:广西壮族自治区职业病防治研究院,南宁市,530021
摘    要:目的识别、评价某焦化有限公司95×104t/a焦化项目可能产生的职业病危害因素,提出相应防护对策和管理措施,保障劳动者身体健康。方法选择与该项目类似的工程作为类比项目采用类比调查法和检查表法进行评价。结果该项目工程选址、总体布局、采光与照明、卫生辅助设施等符合国家有关规定,具备较完善的职业病防护设施和管理措施,生产过程中可能产生硫化氢、二硫化碳、氰化氢、苯、氨、一氧化碳、焦炉逸散物、二氧化氮等职业病危害因素,属严重职业病危害项目。结论该项目在生产过程中可能产生的职业病危害是可以预防的,从职业卫生角度分析该项目是可行的。

关 键 词:焦化项目  职业病危害  预评价

Pre-evaluation on Occupational Hazards in a 950,000 ton/year Coking Project
XU Xiao-li,JIANG Shi-qiang,LV Lin,DUAN Ping-ning,YANG Jing,NIE Chuan-li,HUANG Shi-wen,HUANG Cai-qian.Pre-evaluation on Occupational Hazards in a 950,000 ton/year Coking Project[J].Occupation and Health,2010,26(13):1523-1525.
Authors:XU Xiao-li  JIANG Shi-qiang  LV Lin  DUAN Ping-ning  YANG Jing  NIE Chuan-li  HUANG Shi-wen  HUANG Cai-qian
Institution:(Guangxi Institute for Prevention and Treatment of Occupational Diseases,Nanning,530021,China)
Abstract:Objective]To identify and evaluate the possible occupational hazard factors in 950,000 ton/year coking project of a coking limited company,put forward relevant protection countermeasure and management measure,so as to ensure the health of workers.Methods]The project similar to this project was selected as the analogy project,and the evaluation was carried out with the analogy investigation method and the check list method.Results]The site location,general layout,lighting and illumination,hygienic auxiliary facility of this project accorded with national regulation. The project had perfect protective faciliy for occupational disease and management measures. The possible occupational hazard factors in the production process are hydrogen sulfide,carbon disulfide,hydrogen cyanide,benzene,ammonia,carbon monoxide,coke oven emissions and nitrogen dioxide,and the project is a serious occupational hazards project.Conclusion]The possible occupational hazards in the production process of the project can be prevented. From the view of occupational health,this project is feasible.
Keywords:Coking project  Occupational hazards  Pre-evaluation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号