Analysis on Fault of 220kV Changcheng II Cable Line Sheath Grounding System
Abstract:
Through analysis of fault of 220kV Chengdong and 220kV Changcheng II cable line sheath grounding system, we found the possible cause of fault and put forth measures for prevention and improvement.