首页 | 本学科首页   官方微博 | 高级检索  
     


Comparison of conditional bias‐adjusted estimators for interim analysis in clinical trials with survival data
Authors:Masashi Shimura  Masahiko Gosho  Akihiro Hirakawa
Affiliation:1. Data Science Department, Taiho Pharmaceutical. Co., Ltd., Tokyo, Japan;2. Graduate School of Comprehensive Human Sciences, University of Tsukuba, Tsukuba, Japan;3. Department of Clinical Trial and Clinical Epidemiology, Faculty of Medicine, University of Tsukuba, Tsukuba, Japan;4. Biostatistics and Bioinformatics Section, Center for Advanced Medicine and Clinical Research, Nagoya University Hospital, Nagoya, Japan
Abstract:Group sequential designs are widely used in clinical trials to determine whether a trial should be terminated early. In such trials, maximum likelihood estimates are often used to describe the difference in efficacy between the experimental and reference treatments; however, these are well known for displaying conditional and unconditional biases. Established bias‐adjusted estimators include the conditional mean‐adjusted estimator (CMAE), conditional median unbiased estimator, conditional uniformly minimum variance unbiased estimator (CUMVUE), and weighted estimator. However, their performances have been inadequately investigated. In this study, we review the characteristics of these bias‐adjusted estimators and compare their conditional bias, overall bias, and conditional mean‐squared errors in clinical trials with survival endpoints through simulation studies. The coverage probabilities of the confidence intervals for the four estimators are also evaluated. We find that the CMAE reduced conditional bias and showed relatively small conditional mean‐squared errors when the trials terminated at the interim analysis. The conditional coverage probability of the conditional median unbiased estimator was well below the nominal value. In trials that did not terminate early, the CUMVUE performed with less bias and an acceptable conditional coverage probability than was observed for the other estimators. In conclusion, when planning an interim analysis, we recommend using the CUMVUE for trials that do not terminate early and the CMAE for those that terminate early. Copyright © 2017 John Wiley & Sons, Ltd.
Keywords:group sequential design  unbiased estimator  conditional estimation
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号