首页 | 本学科首页   官方微博 | 高级检索  
     


Quality assurance procedures for the neutron beam monitors at the FiR 1 BNCT facility.
Authors:I Auterinen  T Serén  P Kotiluoto  J Uusi-Simola  S Savolainen
Affiliation:VTT Technical Research Centre of Finland, VTT processes, P.O. Box 1608, FIN-02044 VTT, Finland.
Abstract:In order to assure the stability of the beam, the reliability of the beam monitoring system and the quality of the patient dose delivered, several procedures are followed at the FiR 1 epithermal beam in Finland. Routine procedures include in-phantom activation measurements before each patient treatment and a long-term follow-up of the results. The sensitivity of the beam monitors to external objects in the beam and to variations in the control rod positions in the reactor has been checked and found insignificant. The linearity of the beam monitor channels has been checked with activation measurements. It was found that due to saturation effects a correction of 11% has to be applied when extrapolating results from experiments at low power to full power using the reference monitor channel. The correction is even larger for other channels with higher count rates.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号