品管圈活动在降低气动物流运送等待时间中的实践 |
| |
引用本文: | 吴海英,韦雪虹,贾艳丽,包映辉,张勇军,魏晋才. 品管圈活动在降低气动物流运送等待时间中的实践[J]. 中国护理管理, 2013, 0(11): 60-63 |
| |
作者姓名: | 吴海英 韦雪虹 贾艳丽 包映辉 张勇军 魏晋才 |
| |
作者单位: | [1]温州医科大学附属东阳医院,浙江省东阳市人民医院护理部322100 [2]温州医科大学附属东阳医院,浙江省东阳市人民医院质管科322100 [3]温州医科大学附属东阳医院,浙江省东阳市人民医院呼吸科322100 [4]温州医科大学附属东阳医院,浙江省东阳市人民医院后勤物流系统322100 [5]温州医科大学附属东阳医院,浙江省东阳市人民医院检验科322100 [6]温州医科大学医院管理研究所,浙江省东阳市人民医院检验科322100 |
| |
基金项目: | 卫生部医院管理研究所医院可持续发展研究项目(2010ZHA-YZJ207) |
| |
摘 要: | 目的:通过规范物流运送的管理办法,降低气动物流运送等待时间,充分发挥气动物流优点,提高医院整体工作效率。方法:开展以“降低气动物流运送等待时间”为主题的跨科室品管圈活动,采用现状调查方法对运送量相对较多的9个站点的物流运送等待时间进行了调查研究,通过分析研究制定相应的对策并在全院组织实施,比较开展品管圈活动前后物流运送平均等待时间。结果:物流运送等待时间从原来的平均7.44min下降到平均4.78min,明显提高了整体工作效率。结论:跨科室品管圈活动在降低气动物流运送等待时间中效果显著,有效地提高了工作效率,也充分提高了团队协作能力。
|
关 键 词: | 跨科室 品管圈 物流运送 等待时间 |
The practice of Quality Control Circle in reducing waiting time of pneumatic tube transport |
| |
Affiliation: | WU Hai-ying, WEI Xue- hong, JIA Yan-li, et al. (Nursing Department, Dongyang People's Hospital, Wenzhou Medical University, Dongyang, Zhejiang province, 322100 China) |
| |
Abstract: | Objectives:To reduce the waiting time of pneumatic tube transport by standardizing the managerial approach of pneumatic tube transport systems, to bring the advantage of pneumatic tube transport into full play, and to promote overall hospital working efifciency. Methods:We carried out the activities of Quality Control Circle with the theme of"reducing waiting time of the cross department pneumatic tube transport". We investigated the waiting time in nine busy sites, formulated the countermeasures, put it into practice, and then compared the average waiting time before and after the activites. Results:The waiting time of pneumatic tube transport decreased from 7.44 minutes to 4.78 minutes and this obviously improved overall working efifciency. Conclusion:The activity of cross department Quality Control Circle in different departments could reduce waiting time of pneumatic tube transport and improve the working efifciency and team working ability. |
| |
Keywords: | cross department Quality Control Circle pneumatic tube transport waiting time |
本文献已被 维普 等数据库收录! |
|