首页 | 本学科首页   官方微博 | 高级检索  
     


Computer-assisted work station timing analysis of instrument labor efficiency
Authors:G A McClellan  H C Nipper  M J Horn  W D Burris  K Hodges  S Monaco  R S Cox
Affiliation:Department of Pathology, Creighton University Medical Center, Saint Joseph Hospital, Omaha, Nebraska 68131.
Abstract:Labor use ratings assigned to instruments by the Workload Recording Method (WRM) do not change with batch size or walk-away time use. The authors evaluated the effect of both on the labor use of the analyzers Paramax B6100 (Baxter Paramax, Irvine, CA) and Ektachem 700 (Eastman Kodak, Rochester, NY) by timing all worked and walk-away intervals on both instruments. Extrapolation of the data to a workload of slightly more than 1.1 million tests showed that reapportionment of tests to various batch sizes caused Paramax-Ektachem labor cost differences to fluctuate between $37,254 and $34,995. When the minimum usable walk-away interval length was varied from 1 to 20 minutes, Ektachem savings over Paramax increased from $8,700 to $61,400. The WRM predicted a constant $29,050 labor cost advantage for Ektachem over Paramax. If other instruments show similar labor use characteristics with respect to batch size and walk-away utility, laboratory managers who do not consider these factors may fail to select the most cost-effective instruments for their laboratories.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号